Installation of power and lighting for new bakery

Installation of sub mains, 3 phase DB and supplies to commercial ovens and catering equipment

This job consisted of turning one large unit into two separate smaller units one a bakery and one a commercial kitchen. This involved installing a new 3 phase supply into the bakery supply a new 250amp distribution board. We also installed a high level trunking around the unit allowing us to install conduit drops for isolators and power points to the exact location they were needed.

Similar Case Studies

Merlin AMS Machine Install

Merlin AMS MAchine

This was a complete new installation consisting of cubical housing, AMS area, plant room and dairy.

House Rewire

This was a relatively small installation of lighting, power and supply and controls for a air source heat pump. Because the clients were keen to make there home as energy efficient as possible the builder had to insulate all external walls with kingspan, this allowed us to support our cable in conduit and in turn […]

Installation of LED lighting in new sheep shed

This was a relativly small electrical installation consisting of four 50w LED floods inside the shed and one 30w flood outside controlled off a photocell. The client was extremely happy with the LED light and we have since installed more on the farm