Merlin AMS Machine Install

This was a complete new installation consisting of cubical housing, AMS area, plant room and dairy.

In august of this year we install our first two Merlin AMS machines at Langlands Farm, Catterick. This was a complete new installation consisting of cubical housing, AMS area, plant room and dairy. The two new machines were to milk his high yielding group of cows whilst still run on the farms crystal system.

For this, we installed both the Merlins along with all plant accessories including air compressor and vacuum pump our selves. Our team of electricians and refrigeration engineers also installed all mains electrics and the bulk tank, ice bank and plate cooler.

Similar Case Studies

House Rewire

This was a relatively small installation of lighting, power and supply and controls for a air source heat pump. Because the clients were keen to make there home as energy efficient as possible the builder had to insulate all external walls with kingspan, this allowed us to support our cable in conduit and in turn […]

Installation of LED lighting in new sheep shed

This was a relativly small electrical installation consisting of four 50w LED floods inside the shed and one 30w flood outside controlled off a photocell. The client was extremely happy with the LED light and we have since installed more on the farm

Installation of a Fabdec separation gate

Installation of a Fabdec SELV and compressed air separation gate, to work with a Heatime installation.